Facility

LKAB ReeMAP (Malmberget/Per Geijer — Luleå Industrial Park)

LKAB's ReeMAP project recovers apatite concentrate from iron ore mine tailings at Malmberget/Gällivare (with the Per Geijer deposit as a future extraction component) for processing into phosphorus, rare earth elements and gypsum at a planned circular industrial park in Luleå, where a SEK 800 million demonstration plant began construction in January 2025 with operation planned for end-2026. Recognised as an EU Critical Raw Materials Act Strategic Project in March 2025 (Annex entry 38). Note on material vocabulary: the site's intermediate product is apatite (phosphate) concentrate, which is not in this database's material vocabulary; the nearest phosphate REE-mineral entry, monazite-concentrate, is used with confidence 'inferred', and the Luleå plant's rare earth output form is not specified by LKAB, so mixed-ree-carbonate is likewise an inferred mapping.

Facts on this page last re-verified Aug 11, 2026 — the oldest verification date among its current claims. How we verify.

Location: Luleå, Norrbotten County, Sweden

Mining & feedstock

Apatite extraction and beneficiation (Malmberget, Per Geijer)

Announced

Flotation recovery of apatite concentrate from iron ore mine tailings (pilot verified at Malmberget in 2020); Per Geijer deposit planned as an additional extraction component

Material flow

Rare Earth Ore → Monazite Concentrate

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.

Separation

Apatite-to-critical-minerals processing (Luleå demonstration plant)

Under construction

Chemical dissolution and processing of apatite concentrate to separate phosphorus, rare earth elements and gypsum; SEK 800 million demonstration plant and R&D centre, first unit of the planned Luleå circular industrial park

Material flow

Monazite Concentrate → Mixed Rare Earth Carbonate

Capacity

No capacity claim. Absence of a figure means no source publishes one.

Qualification

No qualification claim. Status does not imply qualified output.

Sources